Guidance for Aquatic Habitat Substrate Depth
DEC’s Division of Fish and Wildlife is responsible for protecting fish, wildlife, and their habitats across New York State. This responsibility also applies to DEC cleanup programs, which are managed by the Division of Environmental Remediation. Cleanup programs are state-run initiatives designed to investigate, remediate, and safely redevelop contaminated properties to protect public health and revitalize local communities
The guidance explains why DEC’s Division of Fish and Wildlife uses two feet of suitable substrate—the natural material that forms the habitat’s bottom layer—when restoring aquatic and wetland areas after cleanup. This depth is intended to help protect fish and wildlife, support healthy habitat and ecosystem recovery, and ensure a consistent approach across the state and DEC programs.
DEC is seeking public comments on guidance for restoring aquatic and wetland habitats at contaminated sites. Public comment period ends on December 4, 2026 and can be submitted to the contact below.
Primary Contact
Sean Madden
NYS DEC - Division of Fish and Wildlife
625 Broadway,
Albany, New York 12233
Email: [email protected]
Bureau of Habitat Energy Unit
The Division of Fish and Wildlife Bureau of Habitat’s Energy unit focuses on the protection of aquatic organisms and habitat from impacts sustained by the operation of facilities with cooling water intake structures, and from operation of hydroelectric facilities. Staff in these programs evaluate the impact of existing and proposed construction, development or water use on streams, rivers and other waterbodies.
This policy, established in July 2011, describes the reductions in impingement mortality and entrainment required to minimize the adverse environmental impact caused by industrial facilities operating a cooling water intake structure (CWIS) in connection with a point source thermal discharge. The operation of CWIS causes injury and mortality to fish and other aquatic organisms through impingement at the intake and/or entrainment through the cooling system. Through this policy, the Department identifies closed-cycle cooling or its equivalent as the performance goal for best technology available (BTA) pursuant to Section 704.5 of 6NYCRR, and Section 316(b) of the federal Clean Water Act in State Pollutant Discharge Elimination System (SPDES) permits issued by the Department in accordance with ECL Article 17, Title 8, and Part 750 of 6NYCRR.
The Department made a Determination of Non-Significance (PDF) which means that the policy does not have a significant adverse impact on the environment and a draft impact statement was not required. Furthermore, the many public comments on the draft policy were summarized and addressed in a Response to Public Comments (PDF) document.
Commissioner Policy-52 Best Technology Available for Cooling Water Intake Structures (PDF)
Cooling Water Impact Mitigation
The Bureau of Habitat’s Energy Unit is made up of biologists who work to mitigate the adverse aquatic impacts resulting from the operation of industrial and commercial cooling water intakes. Steam-electric stations such as fossil fuel and nuclear generating plants use by far the greatest volume of cooling water from our lakes, rivers and marine district compared to office buildings and manufacturing facilities, and as such, their impacts on aquatic ecosystems are greater.
As a consequence of withdrawing water for cooling, fish and other aquatic life may be drawn into the facility and killed when larger individuals become impinged on the intake screens (designed to keep debris in the water from entering the plant), or when early life stages of fish such as eggs and larvae and other small aquatic life pass through the screen mesh and into the station (a process called entrainment). Adverse impacts to aquatic life can also occur through the discharge of cooling water (the temperature often raised by 10 to 20 degrees F) back to the lake or river, a process known as thermal pollution. Thermal pollution can kill fish outright, block fish migrations, cause the growth of nuisance species, and create other problems as well.
Both Section 316(b) (https://www.epa.gov/cooling-water-intakes) of the federal Clean Water Act and New York State regulations (6NYCRR Part 704) provide the legal basis for this program. These laws and regulations protect New York’s waters from thermal pollution and require that cooling water intake structures use the BTA to minimize adverse environmental impacts.
Staff review proposals for the construction of new power plants and periodically assess the operational impacts of existing stations located throughout the State. New power plants are required to use the most protective intake technologies. For existing stations, studies are conducted to determine the magnitude of impact and the actions necessary to minimize those adverse effects. BTA can be implemented through a number of ways, and each facility, whether new or old, presents its own conditions and problems which require site specific assessment. BTA determinations can include many different mitigative technologies and often more than one technology is required at a single facility. In addition to technologies and operational measures, facilities can perform studies to determine the survival of entrained organisms. Mitigation is aimed at minimizing adverse environmental impacts, but not at a social and economic cost that is wholly disproportionate to the related environmental benefit.
New Power Plants
The Energy Unit is at the national forefront in applying state of the art technology to achieve BTA for mitigating impacts from cooling water intakes. For new power plants, these include requiring the use of evaporative, air cooled and hybrid cooling towers to reduce cooling water use by 95% or more, fine wedge wire intake screening and/or aquatic filter barriers to prevent fish impingement and minimize the entrainment of early life stages of fish.
The deregulation of the electric industry in New York State resulted in more than 60 proposals to build new power plants, primarily along the Hudson River estuary, the New York City harbor area, and in Long Island. Although only a few of these proposed plants were ever built, they all use a closed cycle cooling system and protective intake structures, or equivalent mitigation, to minimize impacts on aquatic resources. The Athens Generating Station, in Greene County near the Hudson River was the first major power plant to come on line under the NYS Public Service Commission's Article X siting law. The 1,080 MW station began operating in the later part of 2003. The station uses dry cooling towers and withdraws only 180,000 gallons of water per day. The withdrawal of this water results in very little impact on the aquatic organisms of the Hudson River.
In December 2001, EPA issued final regulations under Section 316(b)of the federal Clean Water Act, establishing location, design, construction and capacity standards for cooling water intakes at new (Phase I) facilities. All new electrical generating stations that withdraw more than 2 million gallons per day (MGD) of cooling water are regulated. In New York State, those subject facilities must comply with both 316(b) and NYCRR 704.5 requirements.
Existing Power Plants and Other Cooling Water Intakes
Existing cooling water intakes in many ways present the most difficult challenge. Retrofitting new technologies on old systems that were never designed for such use can present difficulties. A careful site-specific assessment of the station's impacts and the feasibility and costs of alternatives are required before a decision on BTA can be made. Technologies that have been required to mitigate impacts at existing facilities include:
- Modified Ristroph-type intake screens and return systems designed to reduce impingement stresses and safely return fish to the waterbodies
- Acoustic deterrent systems
- Impingement barrier nets
- Operational restrictions to reduce cooling water flows
- Installation of variable speed pumps and scheduling of unit outages
- Installation of fine-mesh cylindrical wedgewire screens
- Use of off-shore velocity caps
- Site-specific evaluation of entrainment survival
Where impacts are large, the optimal approach from our standpoint is to repower an existing facility into a state-of-the-art power plant. The facility can thus be redesigned into an efficient new station (e.g. using combined cycle technology) that will reduce fuel use, greatly increase thermal efficiency and minimize impacts to air and water. By incorporating BTA in the design phase, the projects can more easily accommodate technologies such as closed cycle cooling, and the most protective intake structures. In addition, this approach results in the re-use of an existing industrial site rather than disturbance to a greenfield site. The old 400 MW Albany Steam Generating Station, a once-through-cooled plant was successfully repowered into the Bethlehem Energy Center (BEC), a 750 MW highly efficient, combined cycle station. Through use of the combined cycle process and mechanical draft cooling towers, cooling water was reduced from approximately 500 MGD to less than 10 MGD. The new BEC began commercial operation in mid 2005. Almost twice as much electricity is now being produced at far lower impacts to the aquatic resource.
Hydropower Facilities
The Energy Unit also reviews operations of hydroelectric stations to mitigate the adverse environmental impacts. The operation of hydroelectric plants can cause serious ecological impacts including fish killed directly as they pass through the turbines used to produce electricity. Water impounded by hydroelectric dams may cause downstream river sections to completely dry up, turn flowing rivers into ponds, and prevent upstream spawning migration of fish.
In-Stream Habitat Protection
The Bureau of Ecosystem Health's Instream Habitat Protection Unit primarily functions to mitigate the adverse environmental impacts from the operation of hydroelectric stations. The operation of hydroelectric plants can cause serious ecological impacts. Fish can be killed directly as they pass through the turbines used to produce electricity. Water impounded by hydroelectric dams may cause downstream river sections to completely dry up, turn flowing rivers into ponds, and prevent upstream spawning migration of fish.
Relicensing
There are currently over 200 hydroelectric projects in New York State. Once every 30 to 50 years these projects are relicensed by the Federal Energy Regulatory Commission (FERC). Since the FERC relicensing process is governed by federal regulations, state laws are preempted except that we must issue a 401 Water Quality Certificate. This certificate contains conditions that will ensure water quality standards for the protection of aquatic resources are met by the project. The way the project is operated can have a dramatic effect on fish and wildlife resources. Many projects historically operated by using large drawdowns in the impoundment to release large flows through their turbines and then shutting off flows to the river. The drawdowns in the impoundment and the shutting off flow to the river cause serious impacts to aquatic resources. DEC staff participate in the federal process where we request studies needed to evaluate the impacts of the project and then recommend mitigation.
Aquatic Base Flow
The Instream Habitat Protection Unit also evaluates non-hydroelectric projects proposing stream base flow alterations that may result in adverse impacts to aquatic resources such as water withdrawals for snowmaking or reservoir releases. This work is conducted under the authority of Article 15 and the 401 Water Quality Certificate portion of the Clean Water Act.