New York County - The New York City Department of Parks and Recreation, as lead agency, has determined that the proposed Central Park North End Recirculation System will not have a significant adverse environmental impact. The action involves the Applicant, the Central Park Conservancy (CPC), is proposing the construction of a water management infrastructure project for the North End of Central Park. The work would consist of: construction of filtration and pumping systems in below-grade vaults with associated controls, piping, and electrical supplies near the Pool and Harlem Meer waterbodies; modification of existing Meer outflow control structure; connections to existing storm sewers and water mains; sediment removal, shoreline stabilization, and installation of filter intake and return piping within the Pool and Meer; installation of recirculation piping from the Meer filtration and pumping system to the North Meadow for connection to the Pool via existing storm sewer infrastructure; site restoration, including turf restoration, plantings and in-kind pavement and curb repairs. The proposed project is being partially funded and coordinated with the New York City Department of Environmental Protection (NYC DEP). The proposed project is expected to begin construction in 2025 and be completed by 2026. The project is located at Central Park - Block 1111, Lot 1 in Manhattan, New York.
Emily Humes
New York City Parks and Recreation
830 Fifth Avenue
New York, NY 10065